"As project Manager for ARM Ltd I have employed Eco~tech Systems on a wide range of projects in terms of the variety of work that was carried out and the contract value. The range of expertise that Eco~tech Systems can offer and their ability to be able to manage projects of different sizes is an attractive aspect of what they offer as a company. An example of this is the project that they completed at Berkhamsted. This was a challenging project because the ground conditions were found to be unsuitable so soil stabilisation works needed to be carried out and Eco~tech Systems evolved the idea and implemented the lime soil stabilisation that was required. The overall contract value of the project was in the region of £500,000 once completed.
Eco~tech Systems are a highly professional company capable of producing work to the highest standard and I look forward to working with them again in the near future."
Stephen Harvey
ARM Ltd
"Eco~tech Systems carried out a contract at The Conway Centre for a 12-week period on the construction of a sewage plant and associated reed bed.
From the beginning they acted in a professional and courteous manner, ensuring that all site safety, welfare and communication systems were in place and maintained throughout the project.
The standard of workmanship was excellent throughout and finished to a very high standard with favourable comments from the landowners, The National Trust.
Eco~tech Systems have shown us that a project can be finished to a very high standard, on time and maintain a high level of site safety with all staff on site behaving in a proper and courteous manner.
I would be happy for them to work on our site again."
Paul Webb
Operations Manager, The Conway Centre
"During my time as Director of Edmond Castle Estates Ltd, Eco~tech Systems were employed to carry out a wide range of services.
I found them to be extremely capable, producing some outstanding results. Their attention to detail was second-to-none. Health Safety and Environmental Safe Working Systems, Risk Assessments and Method Statements were employed throughout all stages of the works and were always adhered to. As the client, we were constantly updated and informed of progress in all areas, with the vast majority of works being completed on time and within budget.
I would have absolutely no reservations whatsoever in recommending this company. They are a well presented, professional company throughout and a pleasure to engage."
Julie Harrison
Former Director Edmond Castle Estates Ltd
ARM have employed Eco~tech Systems on numerous occasions and for many different aspects of work ranging from simple site management to the installation of a full reed bed treatment system which included a CCTV survey of the existing drainage system in place, excavation and installation of 60m3 septic tank, package pump station and manhole chambers to a depth of 3m+, excavation and formation of a reed bed, installation of liner, gravel and pipework in the reed bed and installation of all pipework to connect the system.
Our work is based all over the UK and Eco~tech Systems have worked as far north as Resolis (near Inverness) and Brickendon (near Hertford) in the south.
We have found Eco~tech Systems to be reliable and experienced contractors who are very eager to assist in our works. Their application and attention to detail and finishing is excellent, with a great deal of care taken on accuracy of work and general site tidiness.
We look forward to working with Eco~tech Systems on many forthcoming projects.
David Bailey
Projects Manager ARM Ltd
This Lancaster based company recently undertook the installation of a reed bed system at a busy outdoor education centre on behalf of Peak Associates.
The work was carried to a high standard and the client is delighted with the final installation. The reed bed is currently still within the commissioning stage; however we are expecting to achieve a high quality of effluent discharged from the site in full compliance with all conditions on the Environment Agency discharge consent.
Health and Safety of the site during the construction phase was paramount owing to the full occupancy of the premises by school age children during the duration of the project. Site security was maintained at all times with not one single reported accident or near-miss. Construction was carried out in an efficient and tidy manner with project completion being within the permitted timescale.