Case studies

Eco~tech Systems Case Studies 1

Cowdenbeath CSO Wetland Treatment System

Cowdenbeath Combined Storm Overflow System Recognised as one of the leading experts in the field of Wetland construction, Eco∼tech Systems administered a Contract to construct an Aerated Reed Bed, designed as a Combined Storm Overflow system (CSO). Prior to construction commencing, leaflet drops were made to ensure that all local residents were informed of relevant vehicle movements in the area. Detailed road surveys were undertaken to assess the suitability of the infrastructure to be used …

Read More
Eco~tech Systems Case Studies 2

Lidsey Wastewater Treatment Works

New Reed Bed Treatment Systems at Lidsey Wastewater Treatment Works Eco∼tech were awarded the Contract to create two new Reed Bed Treatment Systems from redundant sludge lagoons located on site at Lidsey WwTW. Both lagoons had previously been dredged by others and required extensive civil engineering works to stabilise and re-profile the basal formation. Further works were undertaken to create and realign batter profiles of the completed perimeter containment bund. Once stabilisation and trimming works …

Read More
Conway Reed Bed

Conway Centre Reed Bed Treatment System

Conway Centre Reed Bed project The Conway Centre occupies 170 acres of National Trust parkland and gardens which extend down to the Menai Strait and include a Private Dock, Adventure Playground, Tipi, Playing Fields, Natural Ponds, Sheltered Shoreline and Mature Woodlands. The site has over 300 beds and it was of paramount importance that the welfare of the resident staff and also the staff and pupils that visited the centre throughout the duration of the …

Read More